Finishing/Treatments
For plastic and metal parts

We can perform a range of finishing processes for each of your parts according to your preferences and requirements
Send Inquiry

OEM CNC Machining alloy steel aviation ground plug shaft - knurled round

    Product Details:
    Product: Grounding Plug Assembly
    Material:Alloy steel
    Surface: Grinding
    Tolerance:±0.01mm
    Application: Indicator Contact Point,Trephine,Slot Pins for Inspection Components,Aircraft Electrical Grounding Plug shaft
  • Share:
  • Inquiry
Product Description

CNC Machining

Turning, Tilling, OEM parts

Material

 (available) 

 1. Aluminum: AL5052, 6061-T6, 6063,6082-T6, 7075-T etc

 2. Stainless steel: 201,301,303,304,310,316L, 17-4(SUS630) etc

 3. Steel: Q195, Q235, Q345B,20#,45# etc.

 4. Brass: C36000 (HPb62), C37700 (HPb59), C26800 (H68) etc

 5. Copper, bronze, Magnesium alloy, Delrin, ABS, POM, PC, etc.

 6. Carbide steel:KD20  RD30 RD50  EF10  AF1  FD25  F20  F08  VD45  CD650  KG7 WF30   G4 G5 

    SKH51 HAP40 ASP23 ASP30 ASP60 NAK55 NAK80 SUJ2  SUS440C SKD11 SLD DC53 SCM430

    CR12  CR12MOV 1.2379 1.2367 H13 S136 SK3 SKS3

 7. Zirconia, Alumina

 Finish

 Sandblasting, anodizing color, Blackening, Zinc/Nickel Plating, Polish, Power coating

 DLC  TICN  TIALN  TIN  NI  CrN  Cr   SOB  

 Nitriding, Nitrogen immersion treatment , High-frequency heat treatment

 Drawing format

 STEP, STP, CAD, PDF, DWG, DXF etc or samples.

 Tolerance

 +/-0.01mm ~ +/-0.002mm

 Surface roughness

 Ra 0.1~3.2

Lead time
 According to the order quantity (usually 7-15 days)

 QC report

 Send with the goods



Packaging and Shipping

 Package

 PE film/ plastic box /polybag/ carton

 According to customer's specific requirements

 Shipping

 By sea, by air, by DHL, UPS, FedEx, etc.



Production management: strictly follow the production process

1. According to the sales order issued by the development task

2. Engineering department arrange to review drawings and process

3. Production department organizes production and processing

4. Assembly and testing after production is completed


Quality management: 

Production process, inspection procedures, after-sales service and quality feedback process in accordance with 

ISO9001 quality management system.

1.Select good quality equipment and raw materials and test them.

2.Every product is systematically tested before it leaves the factory and will never be delivered until it has been proven to have excellent performance.

3.The Quality Department is responsible for the whole process of product inspection and implements a one-vote veto system on quality.


We always put customers first and strive to improve customer satisfaction, shorten lead times and reduce defects.

Significant improvements in quality, productivity, logistics, production environment, delivery and employee engagement

to ensure consistent product performance at every step.